Conditions on planning permissions

The conditions Hastings Borough Council attached to the planning permissions we have read, by kind of application and by what each condition is about, in the council’s words.

170 permissions read, from the decision notices on the council’s files for applications decided since 18 May 2026. 16 more decision notices couldn’t be read (a picture of the page rather than text, or a layout we couldn’t follow) and aren’t counted. Every application is decided on its own facts. These are the conditions attached to past permissions, and a new application may get different ones.

How the conditions are grouped

We copy only each permission’s numbered conditions and their reasons from its decision notice. A condition goes in the first group below whose pattern its wording matches (a regular expression, ignoring case). If no pattern matches, it goes in “Something else”. A permission counts once in a group, however many of its conditions are in it. Refusals and withdrawn applications have no conditions, so they aren’t here. Neither are discharges of conditions or amendments, which are letters about an earlier permission.

  1. Time limit to start: \bbegun (?:before|within|not later than), \bexpiration of (?:one|two|three|five|1|2|3|5) years?, \bcompleted within a period of, \bcommence[ds]? (?:before|within|no later than)
  2. Built to the approved plans: \bin accordance with the (?:following )?approved (?:plans|drawings|details and plans), \bfollowing approved plans
  3. Hours of building work: \b0?8[.:]00\b, \bcarried out (?:only )?(?:within|between) the following (?:times|hours), \bno (?:working|work) on sundays
  4. Construction management: \bconstruction (?:and environmental |environmental |traffic )?management plan, \bconstruction method statement, \bCEMP\b, \bconstruction traffic
  5. Permitted development rights removed: \bgeneral permitted development\b, \bpermitted development\b.{0,200}\bwithout\b, \bnotwithstanding the provisions of the town and country planning
  6. Biodiversity and ecology: \bbiodiversity, \becolog, \bbats?\b, \bnesting birds?\b, \breptiles?\b, \bgreat crested, \bhedgehog, \bhabitat, \b(?:bird|swift|bat) (?:box|brick|boxes|bricks)
  7. Trees and landscaping: \btrees?\b, \blandscap, \barboricultur, \bplanting\b, \bhedges?\b
  8. Drainage and flooding: \bdrainage, \bsurface water, \bSuDS\b, \bfoul (?:water|sewage|drainage), \bflood
  9. Contaminated land: \bcontaminat, \bremediation
  10. Archaeology: \barchaeolog
  11. Parking, access and cycles: \bparking\b, \bcar port, \bcycle (?:storage|parking|store|stores|spaces?), \bbicycle, \bvisibility splays?, \bvehicular access, \bhighway, \bturning (?:space|area|head), \belectric vehicle, \bcharging points?
  12. Bins and recycling: \brefuse, \brecycling, \bbins?\b, \bwaste storage
  13. Windows, balconies and privacy: \bobscured?[- ]glaz, \bobscure glass, \bprivacy screen, \bnon-opening, \bbalcon, \broof terrace
  14. Noise, plant and smells: \bnoise, \bacoustic, \bplant (?:and|or) machinery, \bextract(?:ion|or) (?:system|equipment|fan), \bodours?\b, \bsound insulation
  15. Lighting: \blighting\b, \billuminat
  16. Energy and water use: \b110 litres, \bwater (?:consumption|efficiency|usage), \benergy\b, \bsolar\b, \bheat pump
  17. How the building or land is used: \bused (?:only )?(?:for|as)\b, \bfor no other purpose, \buse class, \bancillary, \boccupied\b, \boccupation of\b, \bopening hours, \bhours of (?:opening|operation|use)
  18. Materials and design details: \bmaterials?\b, \bexternal finish, \bfinishes\b, \broof coverings?, \bcladding, \bsamples?\b, \bbricks?\b, \brender\b, \bjoinery, \belevation drawings, \bsection details, \bflues?\b, \bvents?\b, \bwindows?\b, \bdoors?\b

The rules are in config/planning_conditions.yaml, and no model reads the conditions.

New homes

14 permissions with conditions that we have read. What their conditions are about, the commonest first:

Extensions and alterations

69 permissions with conditions that we have read. What their conditions are about, the commonest first:

Change of use

10 permissions with conditions that we have read. What their conditions are about, the commonest first:

Trees

15 permissions with conditions that we have read. What their conditions are about, the commonest first:

Shops, signs and business

7 permissions with conditions that we have read. What their conditions are about, the commonest first:

Listed buildings

15 permissions with conditions that we have read. What their conditions are about, the commonest first:

Telecoms, power and charging

1 permission with conditions that we have read. What their conditions are about, the commonest first:

Conditions, certificates and amendments

27 permissions with conditions that we have read. What their conditions are about, the commonest first:

Other

12 permissions with conditions that we have read. What their conditions are about, the commonest first: