Planning application HS/FA/26/00461 · Extensions and alterations
Two-storey outbuilding for use as an art studio; to include roof lights and solar panels
1 Turing Way, Hastings, TN34 3FN
- ReceivedWed 5 Aug 2026
- ValidatedWed 5 Aug 2026
- Out for commentNo date published
- DecisionGranted permission, week of Mon 16 Nov 2026
What is proposed
Two-storey outbuilding for use as an art studio; to include roof lights and solar panels
Where it stands
- Reference: HS/FA/26/00461
- Street: Turing Way
- Ward: Baird
- Received: Wed 5 Aug 2026
- Validated: Wed 5 Aug 2026
- Decision: Granted permission, in the week of Mon 16 Nov 2026
Conditions attached
- Built to the approved plans
The development hereby permitted shall be carried out in accordance with the following approved plans: 260801H/LOC - Location Plan 260801H/BLK - Block Plan 260801H/P/5 - Proposed Elevations 260801H/P/2 - Proposed First Floor Plan 260801H/P/1 - Proposed Ground Floor Plan 260801H/P/3 - Proposed Roof Plan 260801H/P/4 - Proposed Site Plan 260801H/P/RWC RevA - Proposed RW Collection
- Time limit to start
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
- How the building or land is used
The outbuilding hereby permitted shall remain ancillary to the residential use of the dwelling known as 1 Turing Way, Hastings, TN34 3FN for purposes incidental to the enjoyment of the dwellinghouse and shall not, at any time, be used for any business or commercial purpose, let or sold as an independent unit.
- Hours of building work
With the exception of internal works the building works required to carry out the development allowed by this permission must only be carried out within the following times:- 08.00 - 18.00 Monday to Friday 08.00 - 13.00 on Saturdays No working on Sundays or Public Holidays.
- Materials and design details
The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form.
- Biodiversity and ecology
Prior to commencement of works (including site clearance), the following precautionary measures for the protection of protected and priority species must be implemented and retained throughout the entirety of the construction period: · At the start of site clearance and throughout the works period, the building must be checked for evidence of nesting birds. If any nesting birds are found, works in the immediate vicinity of any nest must cease until after the birds have finished nesting; · During site clearance any features such as discarded building materials, brash or piles of leaf litter must be carefully lifted and removed from the works area and access route; · If slow worms are found during clearance or construction, they must be carefully removed and placed in the neighbouring offsite receptor area. Should the number of animals found exceed five, then the site ecologist must be contacted for advice regarding additional precautionary mitigation measures required to prevent reptiles from entering the works area; · The garden lawn must be maintained at a height of 10cm or less throughout the works period; · All temporarily stored building materials (that might act as temporary resting places) must be isolated from areas of tall vegetation and raised off the ground on pallets; · Backfilling of trenches and other excavations must be undertaken before nightfall, or a ramp must be left in any trenches or other excavations to allow any animals (such as priority species hedgehog) to easily exit; · All excavations and trenches must be checked each morning throughout the entire construction period to ensure they are clear of animals prior to infilling.
- Biodiversity and ecology
Prior to any works above slab level, a Biodiversity Enhancement Plan shall be submitted to and approved in writing by the local planning authority. This will include measures to enhance the site for protected and/or priority species, such as nesting birds and hedgehog. The approved plan shall be implemented as described and retained thereafter.
- Drainage and flooding
Prior to the commencement of development, an amended drainage strategy incorporating details of the proposed underground water-harvesting storage tank shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall: · Demonstrate that the proposed system will adequately manage surface water runoff without increasing flood risk on or off site. · Include supporting water-balance calculations and hydraulic modelling to demonstrate that the tank provides sufficient effective storage capacity to accommodate runoff from the relevant design rainfall events, including during periods of low water demand. Detail the arrangements for managing surface water when the tank reaches capacity or water-reuse demand is insufficient to maintain the required storage capacity, including any overflow, exceedance and emergency drainage provisions, as appropriate.
- Drainage and flooding
Prior to occupation of the development, a surface water drainage maintenance and management plan, either as a standalone document or incorporated into the drainage strategy, shall be submitted to and approved in writing by the Local Planning Authority. The plan shall cover the entire surface water drainage system, including all piped drainage, storage facilities and associated components, and shall clearly identify the party responsible for the long-term inspection, operation, maintenance and management of the system. The approved plan shall be implemented and maintained for the lifetime of the development.
- Drainage and flooding
Prior to occupation of the development, evidence (including photographs) should be submitted showing that the drainage system has been constructed as per the final agreed detailed drainage designs.
- Drainage and flooding
The flood risk mitigation measures set out in the submitted Flood Risk Mitigation (FRM) Report shall be implemented in full. In particular, the internal finished floor level of the outbuilding shall be set at least 150 mm above the immediately adjoining external ground level.
- Trees and landscaping
No development shall take place until temporary protective fences to safeguard the trees and/or hedges to be retained on the site have been erected in accordance with the current BS5837:2012: Trees in relation to design, demolition and construction, standards and to the satisfaction of the Local Planning Authority. All such fences shall be kept in a sound, upright and complete condition until the development has been completed and/or the Local Planning Authority confirm in writing that the works have been sufficiently completed for the fencing to be removed.
- Trees and landscaping
All arboricultural measures and/or works shall be carried out in accordance with the details and guidance as contained within the already submitted arboricultural report.
Conservation and heritage on this street
None of the town’s 18 conservation areas reaches Turing Way as mapped.
Flood zones, the coast and protected nature on this street
Flood zones
None of Turing Way’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”
Protected nature
Comments on the application
Who the council consulted
- HBC Senior SUDS and Flood Risk Officer, asked Thu 24 Sep 2026
- Ecology, asked Wed 9 Sep 2026
- Canopy IQ ltd., asked Thu 15 Oct 2026
Consultee responses on the file
- SENIOR SUSTAINABLE URBAN DRAINAGE AND FLOOD RISK OFFICER, Tue 22 Sep 2026
- SENIOR SUSTAINABLE URBAN DRAINAGE AND FLOOD RISK OFFICER, Wed 23 Sep 2026
- CANOPY IQ LTD, Fri 25 Sep 2026
- ECOLOGY, Wed 30 Sep 2026
- SENIOR SUSTAINABLE URBAN DRAINAGE AND FLOOD RISK OFFICER, Fri 16 Oct 2026
- BOROUGH ARBORICULTURIST - CANOPY IQ, Thu 22 Oct 2026
Is a comment public?
The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).
We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.
Similar applications nearby
Elsewhere in Baird
- Unit C, 7-8 Brook Way
Proposed extension to enlarge the embroidery area
HS/FA/26/00177, decided in the week of Mon 31 Aug 2026
Granted permission - Pine Crest, 82 Pine Avenue
Proposed replacement single story rear extension.
HS/FA/26/00281, validated Tue 16 Jun 2026, decided in the week of Mon 7 Sep 2026
Granted permission - 15 Sovereign Close
Alterations to elevations including new windows and glazed doors. Engineering works to reduce ground level adjacent to west (side) elevation. Conversion of garage to form ancillary living accommodation. Raising height of existing terrace and formation of glazed balustrade (amended description).
HS/FA/26/00307, validated Thu 21 May 2026, decided in the week of Mon 17 Aug 2026
Granted permission - 7 St Helens Down
Proposed conservatory to front of property with new section of raised patio
HS/FA/26/00233, validated Mon 27 Apr 2026, decided in the week of Mon 8 Jun 2026
Granted permission