Planning application HS/FA/26/00461 · Extensions and alterations

Two-storey outbuilding for use as an art studio; to include roof lights and solar panels

1 Turing Way, Hastings, TN34 3FN

  1. ReceivedWed 5 Aug 2026
  2. ValidatedWed 5 Aug 2026
  3. Out for commentNo date published
  4. DecisionGranted permission, week of Mon 16 Nov 2026

What is proposed

In the council’s words, from its weekly list:

Two-storey outbuilding for use as an art studio; to include roof lights and solar panels

Where it stands

The council’s file ↗

Conditions attached

The decision notice on the council’s file (published Tue 17 Nov 2026) attaches 13 conditions. In the council’s words, each with the reason it gives:

  1. Built to the approved plans
    The development hereby permitted shall be carried out in accordance with the following approved plans: 260801H/LOC - Location Plan 260801H/BLK - Block Plan 260801H/P/5 - Proposed Elevations 260801H/P/2 - Proposed First Floor Plan 260801H/P/1 - Proposed Ground Floor Plan 260801H/P/3 - Proposed Roof Plan 260801H/P/4 - Proposed Site Plan 260801H/P/RWC RevA - Proposed RW Collection

    Reason: For the avoidance of doubt and in the interests of proper planning.

  2. Time limit to start
    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

    Reason: This condition is imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act 1990.

  3. How the building or land is used
    The outbuilding hereby permitted shall remain ancillary to the residential use of the dwelling known as 1 Turing Way, Hastings, TN34 3FN for purposes incidental to the enjoyment of the dwellinghouse and shall not, at any time, be used for any business or commercial purpose, let or sold as an independent unit.

    Reason: To safeguard the character of the area and amenity of adjoining and future residents.

  4. Hours of building work
    With the exception of internal works the building works required to carry out the development allowed by this permission must only be carried out within the following times:- 08.00 - 18.00 Monday to Friday 08.00 - 13.00 on Saturdays No working on Sundays or Public Holidays.

    Reason: To safeguard the amenity of adjoining residents.

  5. Materials and design details
    The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form.

    Reason: In the interests of the visual amenity of the area.

  6. Biodiversity and ecology
    Prior to commencement of works (including site clearance), the following precautionary measures for the protection of protected and priority species must be implemented and retained throughout the entirety of the construction period: · At the start of site clearance and throughout the works period, the building must be checked for evidence of nesting birds. If any nesting birds are found, works in the immediate vicinity of any nest must cease until after the birds have finished nesting; · During site clearance any features such as discarded building materials, brash or piles of leaf litter must be carefully lifted and removed from the works area and access route; · If slow worms are found during clearance or construction, they must be carefully removed and placed in the neighbouring offsite receptor area. Should the number of animals found exceed five, then the site ecologist must be contacted for advice regarding additional precautionary mitigation measures required to prevent reptiles from entering the works area; · The garden lawn must be maintained at a height of 10cm or less throughout the works period; · All temporarily stored building materials (that might act as temporary resting places) must be isolated from areas of tall vegetation and raised off the ground on pallets; · Backfilling of trenches and other excavations must be undertaken before nightfall, or a ramp must be left in any trenches or other excavations to allow any animals (such as priority species hedgehog) to easily exit; · All excavations and trenches must be checked each morning throughout the entire construction period to ensure they are clear of animals prior to infilling.

    Reason: To protect biodiversity in accordance with the Wildlife and Countryside Act 1981, NPPF 2026 and Hastings Local Plan 2014.

  7. Biodiversity and ecology
    Prior to any works above slab level, a Biodiversity Enhancement Plan shall be submitted to and approved in writing by the local planning authority. This will include measures to enhance the site for protected and/or priority species, such as nesting birds and hedgehog. The approved plan shall be implemented as described and retained thereafter.

    Reason: To enhance biodiversity in accordance with the NPPF 2026 and Hastings Local Plan 2014.

  8. Drainage and flooding
    Prior to the commencement of development, an amended drainage strategy incorporating details of the proposed underground water-harvesting storage tank shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall: · Demonstrate that the proposed system will adequately manage surface water runoff without increasing flood risk on or off site. · Include supporting water-balance calculations and hydraulic modelling to demonstrate that the tank provides sufficient effective storage capacity to accommodate runoff from the relevant design rainfall events, including during periods of low water demand. Detail the arrangements for managing surface water when the tank reaches capacity or water-reuse demand is insufficient to maintain the required storage capacity, including any overflow, exceedance and emergency drainage provisions, as appropriate.

    Reason: To ensure any flood risk arising from the development is effectively managed.

  9. Drainage and flooding
    Prior to occupation of the development, a surface water drainage maintenance and management plan, either as a standalone document or incorporated into the drainage strategy, shall be submitted to and approved in writing by the Local Planning Authority. The plan shall cover the entire surface water drainage system, including all piped drainage, storage facilities and associated components, and shall clearly identify the party responsible for the long-term inspection, operation, maintenance and management of the system. The approved plan shall be implemented and maintained for the lifetime of the development.

    Reason: To ensure any flood risk arising from the development is effectively managed.

  10. Drainage and flooding
    Prior to occupation of the development, evidence (including photographs) should be submitted showing that the drainage system has been constructed as per the final agreed detailed drainage designs.

    Reason: To ensure any flood risk arising from the development is effectively managed.

  11. Drainage and flooding
    The flood risk mitigation measures set out in the submitted Flood Risk Mitigation (FRM) Report shall be implemented in full. In particular, the internal finished floor level of the outbuilding shall be set at least 150 mm above the immediately adjoining external ground level.

    Reason: To ensure any flood risk arising from the development is effectively managed.

  12. Trees and landscaping
    No development shall take place until temporary protective fences to safeguard the trees and/or hedges to be retained on the site have been erected in accordance with the current BS5837:2012: Trees in relation to design, demolition and construction, standards and to the satisfaction of the Local Planning Authority. All such fences shall be kept in a sound, upright and complete condition until the development has been completed and/or the Local Planning Authority confirm in writing that the works have been sufficiently completed for the fencing to be removed.

    Reason: In the interests of the health of the trees and to protect the visual amenity.

  13. Trees and landscaping
    All arboricultural measures and/or works shall be carried out in accordance with the details and guidance as contained within the already submitted arboricultural report.

    Reason: In the interests of the health of the trees and to protect the visual amenity.

We copy the numbered conditions and their reasons and nothing else from the notice. Its notes to the applicant are on the file. The label on each is ours, by rules on the council’s wording. The conditions the council attaches, by kind of application

Conservation and heritage on this street

None of the town’s 18 conservation areas reaches Turing Way as mapped.

Measured along the street’s line against the council’s boundaries. Whether a particular building is inside depends on where the boundary runs: each area’s page on the council’s site has its map. All 18 conservation areas

The council’s Article 4 direction on houses in multiple occupation covers the whole town (in force since 2 July 2012): turning a house into a shared house for three to six people needs planning permission. The council’s page ↗

Conservation areas, Article 4 directions and tree preservation orders: Hastings Borough Council, Open Government Licence v3.0. Street lines © OpenStreetMap contributors.

Flood zones, the coast and protected nature on this street

We place an application by the street in its address, so these are about where Turing Way runs. For the site’s boundary, see the application’s documents on the council’s file.

Flood zones

None of Turing Way’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”

A street’s line is not an address. For a particular address, use the Environment Agency’s Check your long term flood risk ↗; for a planning site, its Flood map for planning ↗. Flood warnings in force now are on Live now.

Protected nature

No Site of Special Scientific Interest, Special Area of Conservation, Local Nature Reserve, ancient woodland or country park is within about 100 m of Turing Way’s line, and it is outside the High Weald National Landscape. Protected nature in Hastings

Flood zones: © Environment Agency copyright and/or database right 2025. Open Government Licence v3.0. Read 10 November 2026.

Coastal erosion and the Shoreline Management Plan: © Environment Agency copyright and/or database right 2025. © Environment Agency copyright and/or database right 2015. Open Government Licence v3.0. Read 10 November 2026.

Protected sites: © Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026. Open Government Licence v3.0. Read 10 November 2026.

Street lines © OpenStreetMap contributors.

Comments on the application

The council’s file counts no comments from the public (as it stood on Tue 17 Nov 2026).

Who the council consulted

The bodies and officers the file lists as consulted, with the day each was asked.

Consultee responses on the file

Responses filed as consultee comments, under the names the file gives them, with the day each was published. To read one, open its document on the council’s file.

Is a comment public?

The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).

We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.

Similar applications nearby

Other applications of the same kind (extensions and alterations) on Turing Way or in Baird ward, decided ones first, since our record starts on 21 April 2026. A refusal is marked, and its reasons are in the decision notice on the council’s file. Every application is decided on its own facts.

Elsewhere in Baird

If you think work doesn’t match what was approved

The council’s planning enforcement team looks into building work or a use that may not have permission, or may not follow the approved plans or conditions. Its page explains how to report it and which cases it deals with first: planning enforcement on the council’s site ↗

Our planning record starts on 21 April 2026, from the council’s weekly lists of new and decided applications. We list the site, the proposal, the dates, the decision, the comment counts and a permission’s conditions. We don’t copy a commenter’s or an individual applicant’s details. An applicant is named only when it is an organisation we can match exactly to a council, a registered charity or a company on Companies House. The council decides planning applications. We don’t.