Planning application HS/FA/26/00452
Construction and operation of a micro energy storage project consisting of a 200kW (800kWhr) Energy Storage System…
Verge at the intersection of Queensway and Napier Road
- ReceivedTue 28 Jul 2026
- ValidatedTue 28 Jul 2026
- Out for commentNo date published
- DecisionGranted permission, week of Mon 23 Nov 2026
What is proposed
Construction and operation of a micro energy storage project consisting of a 200kW (800kWhr) Energy Storage System (ESS) (known as a 'Battery Box').
Where it stands
- Reference: HS/FA/26/00452
- Street: Napier Road
- Ward: Hollington
- Received: Tue 28 Jul 2026
- Validated: Tue 28 Jul 2026
- Decision: Granted permission, in the week of Mon 23 Nov 2026
Conditions attached
- Time limit to start
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
- Built to the approved plans
The development hereby permitted shall be carried out in accordance with the following approved plans: 01-A, 02-A, 04-B Ecology Report (06/10/2026), Battery Noise Assessment (26 May 2026), Planning Statement (July 2026).
- Construction management
Prior to commencement of works (including site clearance), a Construction Ecological Management Plan (CEMP) must be submitted to and approved in writing by the local planning authority. The CEMP must include the recommendations in sections 3.3, 8.3 and 13.3 of the Preliminary Ecological Appraisal (Arbtech, October 2026), and additional measures as follows: • Identification of ‘biodiversity protection zones’ outside of all access and works areas on appropriately scaled plans; • Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction, including reference to access routes, staged vegetation clearance, excavations, pipework, temporary storage of materials and control of chemicals and pollutants; • Use of protective fences, exclusion barriers and warning signs to avoid impacts on retained areas of designated wildlife verge habitat; • Any times during construction when specialist ecologists need to be present on site to oversee works (if required); • Protocol for unexpected finds of protected species. The approved CEMP must be adhered to and implemented throughout the construction period in accordance with the approved details.
- Biodiversity and ecology
Prior to commencement of works (including site clearance), a Biodiversity Enhancement Plan must be submitted to and approved in writing by the local planning authority. The Plan must include proposals for grassland management to provide enhancement for pollinating insects. The development shall be carried out in accordance with the approved details set out in the Biodiversity Enhancement Plan and enhancement requirements thereafter retained.
- Construction management
Prior to commencement of works (including site clearance), a Construction Management Plan (CMP) must be submitted to and approved in writing by the Local Planning Authority. The Plan shall provide details as appropriate but not be restricted to the following matters: · the anticipated number, frequency and types of vehicles used during construction, · the method of access, egress, turning and routeing of vehicles · the parking of vehicles by site operatives and visitors, · the loading and unloading of plant, materials and waste, · the storage of plant and materials used in construction of the development, · the erection and maintenance of security hoarding, · the provision and utilisation of wheel washing facilities and other works required to mitigate the impact of construction on the public highway (including the provision of temporary Traffic Regulation Orders), · temporary diversion or protection of public rights of way · arrangement of holding areas for construction vehicles · details of public engagement both prior to and during construction works The approved CMP must be adhered to and implemented throughout the construction period in accordance with the approved details.
- Trees and landscaping
Within six months of the permanent cessation of the operation of the development hereby permitted, all battery cabinets, electrical equipment, fencing, foundations, cabling and other associated infrastructure shall be permanently removed from the site. The land shall thereafter be restored to its former condition as a grassed highway verge in accordance with a restoration scheme submitted to and approved in writing by the Local Planning Authority before the removal works commence. The approved restoration scheme shall be fully implemented within the next available planting season following removal of the development.
Conservation and heritage on this street
None of the town’s 18 conservation areas reaches Napier Road as mapped.
Flood zones, the coast and protected nature on this street
Flood zones
None of Napier Road’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”
Protected nature
- Ancient woodland: Napier Road’s line passes within about 100 m of 2 parcels on Natural England’s inventory.
Comments on the application
Who the council consulted
- Nature Space, asked Fri 21 Aug 2026
- Highways, asked Wed 28 Oct 2026
- Environmental Services (Residential), asked Fri 21 Aug 2026
- Environmental Health Pollution, asked Tue 25 Aug 2026
- SGN High Pressure Pipeline
- UK Power Networks(Operations)
- Ecology, asked Wed 28 Oct 2026
Consultee responses on the file
- NATURESPACE, Thu 27 Aug 2026
- ESCC HIGHWAYS, Tue 8 Sep 2026
- SGN, Wed 9 Sep 2026
- SGN MAP, Wed 9 Sep 2026
- ENVIRONMENTAL HEALTH, Fri 13 Nov 2026
- ECOLOGY, Wed 18 Nov 2026
- ECOLOGY - CABLES, Thu 19 Nov 2026
- HIGHWAYS, Tue 24 Nov 2026
Is a comment public?
The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).
We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.