Planning application HS/FA/26/00452

Construction and operation of a micro energy storage project consisting of a 200kW (800kWhr) Energy Storage System…

Verge at the intersection of Queensway and Napier Road

  1. ReceivedTue 28 Jul 2026
  2. ValidatedTue 28 Jul 2026
  3. Out for commentNo date published
  4. DecisionGranted permission, week of Mon 23 Nov 2026

What is proposed

In the council’s words, from its weekly list:

Construction and operation of a micro energy storage project consisting of a 200kW (800kWhr) Energy Storage System (ESS) (known as a 'Battery Box').

Where it stands

The council’s file ↗

Conditions attached

The decision notice on the council’s file (published Tue 24 Nov 2026) attaches 6 conditions. In the council’s words, each with the reason it gives:

  1. Time limit to start
    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

    Reason: This condition is imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act 1990.

  2. Built to the approved plans
    The development hereby permitted shall be carried out in accordance with the following approved plans: 01-A, 02-A, 04-B Ecology Report (06/10/2026), Battery Noise Assessment (26 May 2026), Planning Statement (July 2026).

    Reason: For the avoidance of doubt and in the interests of proper planning.

  3. Construction management
    Prior to commencement of works (including site clearance), a Construction Ecological Management Plan (CEMP) must be submitted to and approved in writing by the local planning authority. The CEMP must include the recommendations in sections 3.3, 8.3 and 13.3 of the Preliminary Ecological Appraisal (Arbtech, October 2026), and additional measures as follows: • Identification of ‘biodiversity protection zones’ outside of all access and works areas on appropriately scaled plans; • Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction, including reference to access routes, staged vegetation clearance, excavations, pipework, temporary storage of materials and control of chemicals and pollutants; • Use of protective fences, exclusion barriers and warning signs to avoid impacts on retained areas of designated wildlife verge habitat; • Any times during construction when specialist ecologists need to be present on site to oversee works (if required); • Protocol for unexpected finds of protected species. The approved CEMP must be adhered to and implemented throughout the construction period in accordance with the approved details.

    Reason: To protect biodiversity during construction in accordance with the Wildlife and Countryside Act and the requirements of the National Planning Policy Framework.

  4. Biodiversity and ecology
    Prior to commencement of works (including site clearance), a Biodiversity Enhancement Plan must be submitted to and approved in writing by the local planning authority. The Plan must include proposals for grassland management to provide enhancement for pollinating insects. The development shall be carried out in accordance with the approved details set out in the Biodiversity Enhancement Plan and enhancement requirements thereafter retained.

    Reason: To enhance biodiversity in accordance with the requirements of the National Planning Policy Framework and the Hastings Local Plan.

  5. Construction management
    Prior to commencement of works (including site clearance), a Construction Management Plan (CMP) must be submitted to and approved in writing by the Local Planning Authority. The Plan shall provide details as appropriate but not be restricted to the following matters: · the anticipated number, frequency and types of vehicles used during construction, · the method of access, egress, turning and routeing of vehicles · the parking of vehicles by site operatives and visitors, · the loading and unloading of plant, materials and waste, · the storage of plant and materials used in construction of the development, · the erection and maintenance of security hoarding, · the provision and utilisation of wheel washing facilities and other works required to mitigate the impact of construction on the public highway (including the provision of temporary Traffic Regulation Orders), · temporary diversion or protection of public rights of way · arrangement of holding areas for construction vehicles · details of public engagement both prior to and during construction works The approved CMP must be adhered to and implemented throughout the construction period in accordance with the approved details.

    Reason: In the interests of highway safety and the amenities of the area.

  6. Trees and landscaping
    Within six months of the permanent cessation of the operation of the development hereby permitted, all battery cabinets, electrical equipment, fencing, foundations, cabling and other associated infrastructure shall be permanently removed from the site. The land shall thereafter be restored to its former condition as a grassed highway verge in accordance with a restoration scheme submitted to and approved in writing by the Local Planning Authority before the removal works commence. The approved restoration scheme shall be fully implemented within the next available planting season following removal of the development.

    Reason: To ensure the satisfactory restoration of the site when the development is no longer required, in the interests of visual amenity, biodiversity and the proper management of highway land, in accordance with Policies DM1 and EN3 of the Hastings Local Plan and the National Planning Policy Framework.

We copy the numbered conditions and their reasons and nothing else from the notice. Its notes to the applicant are on the file. The label on each is ours, by rules on the council’s wording. The conditions the council attaches, by kind of application

Conservation and heritage on this street

None of the town’s 18 conservation areas reaches Napier Road as mapped.

Measured along the street’s line against the council’s boundaries. Whether a particular building is inside depends on where the boundary runs: each area’s page on the council’s site has its map. All 18 conservation areas

The council’s Article 4 direction on houses in multiple occupation covers the whole town (in force since 2 July 2012): turning a house into a shared house for three to six people needs planning permission. The council’s page ↗

Conservation areas, Article 4 directions and tree preservation orders: Hastings Borough Council, Open Government Licence v3.0. Street lines © OpenStreetMap contributors.

Flood zones, the coast and protected nature on this street

We place an application by the street in its address, so these are about where Napier Road runs. For the site’s boundary, see the application’s documents on the council’s file.

Flood zones

None of Napier Road’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”

A street’s line is not an address. For a particular address, use the Environment Agency’s Check your long term flood risk ↗; for a planning site, its Flood map for planning ↗. Flood warnings in force now are on Live now.

Protected nature

Natural England’s designations within about 100 m of the street’s mapped line. Each official page says what is protected there. Protected nature in Hastings

Flood zones: © Environment Agency copyright and/or database right 2025. Open Government Licence v3.0. Read 10 November 2026.

Coastal erosion and the Shoreline Management Plan: © Environment Agency copyright and/or database right 2025. © Environment Agency copyright and/or database right 2015. Open Government Licence v3.0. Read 10 November 2026.

Protected sites: © Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026. Open Government Licence v3.0. Read 10 November 2026.

Street lines © OpenStreetMap contributors.

Comments on the application

The council’s file counts no comments from the public (as it stood on Tue 24 Nov 2026).

Who the council consulted

The bodies and officers the file lists as consulted, with the day each was asked.

Consultee responses on the file

Responses filed as consultee comments, under the names the file gives them, with the day each was published. To read one, open its document on the council’s file.

Is a comment public?

The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).

We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.

If you think work doesn’t match what was approved

The council’s planning enforcement team looks into building work or a use that may not have permission, or may not follow the approved plans or conditions. Its page explains how to report it and which cases it deals with first: planning enforcement on the council’s site ↗

Our planning record starts on 21 April 2026, from the council’s weekly lists of new and decided applications. We list the site, the proposal, the dates, the decision, the comment counts and a permission’s conditions. We don’t copy a commenter’s or an individual applicant’s details. An applicant is named only when it is an organisation we can match exactly to a council, a registered charity or a company on Companies House. The council decides planning applications. We don’t.